Meet Schedule
Train Mountain Memberships
Train Mountain Store
Train Mountain Group Tours
Area Information
Train Mountain News
Photo Albums
Train Mountain Resources
Links
About Train Mountain
Contact Train Mountain
Train Mountain Home

View Cart

Train Mountain
Railroad Museum

36941 S. Chiloquin Rd.
Chiloquin, OR 97624

Phone: (541) 783-3030
Fax: (541) 783-2013



Train Mountain Railroad Museum

Train Mountain Statistics

The following are the most frequently requested statistics about Train Mountain. If you think that there is a statistic that should be added to this list, we would appreciate you letting us know at Info@TrainMountain.org. Please note that if the suggestion requires counting, measuring or calculating, we might ask you to help complete the task you have suggested. This revision was done by Russ Wood and is correct as of 2001 October 01.

 

Track Gauge:    
Track Gauge: 7.5" Nominal, 7.625" Actual
   
Track:    
Main Line Track:   67,366', 12.75 miles
Ancillary Trackage:   50.244',   9.50 miles
Total Trackage: 117,610', 22.25 miles
   
Minimum Radius:   75'
Typical Radius: 125'
   
Maximum Grade: 3.2% (One in 31)
Typical Grade: 1.5% (One in 67)
   
>75' Radius Turnouts: 550
>100' Radius Turnouts:   31
TotalTurnouts: 581
   
Mainline Stubs:   20
Yard Stubs: 131
Total Stubs: 151
   
Bridges:    
Art Span of Crisp Bridge:   8' x 24' steel truss
Genevieve Span of Crisp Bridge:   8' x 24' steel truss
Cox Bridge:   8' x 21.5' steel truss
Ellingson Bridge: 12' x 20' steel beam
Perrin Bridge:   8' x 28' steel truss
Wright Bridge:   8' x 20' steel truss
   
Tunnels:    
Jones Timber Tunnel:   4' 8" x 6' x 145' creosoted timbers
Main Yard Tunnel:   5' x 7' x 300' corrugated steel
Rio Grande Tunnel: 16' x 12' recycled fuel tank
South Chiloquin Road Tunnel: 12' x 80' corrugated steel
   
Ellingson Turntable:    
Length, Type: 40' long, hydraulic lift gates and turning motor
Steaming Bays: 32
Storage Tracks: 83
   
Crisp Yard (main loading and unloading area):    
Transfer Tables: Two 12' long Transfer Tables with Hydraulic Lifts
Steaming Bays: 24
Storage Tracks: 26
   
Storage Yards:    
Blue Caboose:   13 Yard Tracks
Blue Mountain:     7 Yard Tracks
Main Yard: 105 Yard Tracks, with 220 switches

 

 

Meet Schedule : Memberships : Store : Group Tours : Area Info : News : Gallery : Resources : Links : About : Contact : Home
 
  Copyright © 2001-2007 Train Mountain Railroad Museum. All Rights Reserved. Privacy.
Web Design & Development by Impact Design Studios.